Phosphate Rock Milling and Packaging in Nigeria; The Feasibility Report.

Published - 19 Feb, 2019| Analyst - Foraminifera Market Research Limited| Code - fora/2019/otpheasrph/421

Select Report Format

Subtotal 30,000

Best Price Guaranteed*

Nigeria is blessed with abundant mineral resources, which are from time immemorial formed the backbone of the nation’s economic and industrial development aspirations. Prior to independence, the nation’s mineral raw material resources contributed immensely to the export earnings of the nation.

For over three decades, the Country has continued to depend entirely on oil for her revenue and the volatile nature of the oil market has made it imperative for us to diversify the mono-product economy through exploitation and processing of our abundant solid mineral resources.

The clamour for resource control being advocated by states with petroleum resources in their domain makes it imperative for us to develop, exploit, process and utilize our solid minerals – particularly Non-metallic Minerals as every part of this country is blessed with one or more solid mineral that could yield substantial revenue for sustainable development.

Exploitation of the Non-metallic Minerals has not attained the desired level, mainly because of the various constraints associated with their exploitation, development and processing for utilization. Many of the non-metallic minerals, which are vital to the industrial take off of the country, have been found in commercial quantities within the country.

They include limestone, dolomite, marble, kaolin, barite, diatomite, feldspar, quartz and silica sands, gypsum, phosphate rock, talc, silimanite, kyanite, phosphate, salt and bentonite.

Phosphate rock refers to a mineral assemblage that occurs naturally with an exceptionally high concentration of phosphate minerals. Phosphate usually occurs as the mineral apatite, Ca5F(PO4)3 in igneous and metamorphic rocks. It may be derived from a number of sources but the most common is the one that contains high concentration of phosphates in nodular or compact masses.

The Nigerian phosphate rock deposits are sedimentary in origin. They occur mostly in granular, nodular and vesicular forms with an average weight percent of P205 varying from 34.5 to 36.25%, which compares favourably with the phosphate at Hahotos, Togo (36.6%).

Occurrences of phosphate rock are known in Sokoto, Abia, Cross Rivers, Kogi, Ondo and Ogun States. The deposits of phosphate beds in the Sokoto embayment represent southward extension of the deposits in Niger Republic.
The deposits are found in areas within the geological feature termed the Illummeden Basin.

Phosphate fertilizer and detergents are the major user industries of phosphate rock. Metal treatment, water treatment, pulp and paper, glass and ceramics, textiles, plastics, rubber, pharmaceuticals and cosmetics, petroleum production, toothpaste, paints, fuels, cells are other end-user industries of phosphate rock.

This report seeks to examine the financial viability or otherwise of establishing a phosphate rock milling plant in Nigeria.

The demand for milled phosphate is quite high in Nigeria and the raw material is also available in commercial quantity.

The production capacity of the proposed milling plant is one point five (1.5) tons per hour and the plant would operate at eighty percent (80%) of the installed capacity for three hundred (300) working days per annum for ten (10) hours per day and producing six hundred (600) tons of milled phosphate bi-monthly packed in fifty (50) kilogramm Polypropylene (PP) woven sacks with input output ratio of 1:0.95.

Table of Contents

EXECUTIVE SUMMARY 1.0 Business Overview 1.1 Description of the Business 1.2 Vision and Mission Statement 1.3 Business Objective 1.4 Critical Success Factor of the Business 1.5 Current Status of Business 1.6 Description of the Business Industry 1.7 Contribution to Local and National Economy 2. Marketing Plan 2.1 Description of product 2.2 Product Packaging and delivery 2.3 The Opportunity 2.4 Pricing Strategy 2.5 Target Market 2.6 Distribution and Delivery Strategy 2.7 Promotional Strategy 2.8 Competition 3. Production Plan 3.1 Description of the Location 3.2 Raw Materials 3.3 Production Equipment 3.4 Production Process 3.5 Production Cost 3.6 Stock Control Process 3.7 Pre-Operating activities and expenses 3.7.1 Operating Activities and Expenses 3.8 Project Implementation Schedule 4.0 Organizational and Management Plan 4.1 Ownership of the business 4.2 Profile of the promoters 4.3 Key Management Staff 4.3.2 Management Support Units 4.4 Details of salary schedule 5. Financial Plan 5.1 Financial Assumption 5.2 Start -up Capital Estimation 5.3 Source of Capital 5.4 Security of Loan 5.5 Loan Repayment Plan 5.6 Profit and Loss Analysis 5.7 Cash Flow Analysis 5.8 Viability Analysis 6.0 Business Risk and mitigation factor 6.1 Business Risks 6.2 SWOT Analysis

Project Specification:

Plant Capacity: One point five (1.5) tons per hour
Capacity Utilization: Eighty percent (80%)
Loan Tenor: Twenty-four (24) months
Interest Rate: Twenty-five percent (25%)
Moratorium: Two (2) months

Additional Info

Report Type: feasibility report
Formats of Delivery:
No. of Pages: MS Word - 30 pages and Excel - 6 pages
Report Code: fora/2019/otpheasrph/421
Publisher: Foraminifera Market Research Limited
Price: ₦30,000
Release Date: 19 Feb, 2019 Updated quarterly.
Language: English
Delivery time: Within twenty-four (24) hours.

Get this Report

Direct bank transfer

To order the report, Please do pay the sum of ₦30,000 into

Bank Name : Eco Bank Plc
Account Name : Foraminifera Market Research Ltd
Account Number : 274 20 569 37
Bank Name : United Bank for Africa (UBA)
Account Name : Foraminifera Market Research Ltd
Account Number : 101 76 603 95
Bank Name : Guaranty Trust Bank Plc (GTB)
Account Name : Foraminifera Ventures
Account Number : 011 66 066 32

Make your payment directly into our bank account. Please use your Order ID as the payment reference. Your order will not be shipped until the funds have cleared in our account.

Instructions

After payment call us on 01 -29 52 413 / 08033782777 or email us at foraminiferamarketresearch@yahoo.com with the payment details. After payment confirmation, the soft copy of the report would be sent to you within 24 hours.